Boilers & Wet Scrubbers

Boilers & Emission Control Solutions

Sugar plants rely on efficient boilers for steam and power generation, while strict environmental regulations demand clean emissions. Anvisha Sugar Engg Pvt Ltd provides Non-IBR boiler support services and high-performance Wet Scrubbers that achieve emission levels below 100 mg/Nm³ — meeting and exceeding regulatory standards.

Our emission control expertise extends to complete boiler performance improvement consultancy. We have helped plants significantly reduce their emission levels while simultaneously improving boiler efficiency and fuel utilization.

Services & Equipment

  • Non-IBR Boiler Work — Fabrication, modification, and maintenance services for sugar plant boilers (non-IBR category)
  • Wet Scrubbers — High-efficiency wet scrubbers designed to achieve particulate emissions below 100 mg/Nm³, compliant with CPCB norms
  • Emission Control Consultancy — Detailed analysis and solutions for boiler emission control and performance improvement
  • Boiler Performance Audit — Identification of efficiency losses and corrective measures to improve steam generation and fuel economy
  • Co-Generation Integration — Engineering support for integrating boilers with co-generation (power export) systems
  • Bagasse Handling Systems — Design and fabrication of bagasse handling systems (MBC, BE, RBC) for boiler fuel management
<100
mg/Nm³ Emission
Guarantee
15 MW
Co-Gen Projects
Consulted
CPCB
Compliant
Design
Industrial Boilers – Anvisha Sugar
Environmental Compliance

Our Wet Scrubbers are engineered to achieve emission levels below 100 mg/Nm³ — meeting all CPCB and State Pollution Control Board requirements.

Get Expert Help

Contact us for boiler troubleshooting and emission control solutions: anvishasugar@gmail.com

Boiler & Emission Projects

Work TypeWork DescriptionClientYear
ConsultancyEmission Control – Boiler Performance ImprovementGanpati Sugar, Sangareddy (Telangana)2021–22
ConsultancyPreparation of DPR, Tender document, Evaluation of offers for 15 MW Co-Generation ProjectAthani Sugar – Unit III2022–23
FabricationFabrication of Bagasse Handling System – MBC, BE & RBCISGEC – Shri Ambalika Sugar2023–24
Design & SupplyShredder Feeder (Export Order)Aryan Boilers2024–25
SupplySupply & Commissioning – Voltamp 11kV to 430V Transformer – 2.75 MVAVilas Sugar – Unit 12022–23

Improve Your Boiler Performance

Contact Anvisha Sugar for emission control solutions, boiler audits, and wet scrubber design & supply.

Contact Us View Consultancy Services